1:350 model

Demonstrating the building across it’s 4 stages; existing, deconstruction, reconstruction, complete. Referencing the colour coding used within the de/reconstruction methodology, blue denotes reconstructed, and purple denotes construction systems.

1:350 model Demonstrating the building across it’s 4 stages; existing, deconstruction, reconstruction, complete. Referencing the colour coding used within the de/reconstruction methodology, blue denotes reconstructed, and purple denotes construction systems.

A staged policy tailored to Sydney’s governance and industry capacity, establishing benchmarks and mandatory assessments to reduce demolition, expand reuse pathways, and enable an enforceable shift toward circular construction practices.

A staged policy tailored to Sydney’s governance and industry capacity, establishing benchmarks and mandatory assessments to reduce demolition, expand reuse pathways, and enable an enforceable shift toward circular construction practices.

The design keeps the lower tower intact, selectively deconstructs upper floors for material recovery, then rebuilds a taller form to meet DA statistics while satisfying Phase 1 benchmarks.

The design keeps the lower tower intact, selectively deconstructs upper floors for material recovery, then rebuilds a taller form to meet DA statistics while satisfying Phase 1 benchmarks.

Level 0 hosts on-site storage and material reprocessing, while Level 27 acts as a controlled disassembly zone using an adapted Tecorep system, enabling selective deconstruction without disrupting the commercial floors.

Level 0 hosts on-site storage and material reprocessing, while Level 27 acts as a controlled disassembly zone using an adapted Tecorep system, enabling selective deconstruction without disrupting the commercial floors.

Video frames capture each step of the workflow: selective removal, controlled lowering, on-site processing, and reconstruction, highlighting how the adapted Tecorep method enables a continuous, non-disruptive transformation of the tower.

Video frames capture each step of the workflow: selective removal, controlled lowering, on-site processing, and reconstruction, highlighting how the adapted Tecorep method enables a continuous, non-disruptive transformation of the tower.